Google
 

STUDY OF OPTIMALLY ELECTRICITY POWER SUPPLY IN CENTRAL JAVA PROVINCE.

>

Electricity planning includes identification of energy resources for and potential problem in electricity generation, effort to solve the problem. The planning is usually written in annual program. There is a correlation between electricity growth and economic growth. The sensitivity study for Central Java province has been done by three scenarios of annual electricity growth, i.e: 6,7 %, 8 % and 10 % with the study periods of 2003-2020. The tools used in this sensitivity study is WASP IV. Total installed capacity in the end of study periods for each electricity growth scenarios are 3960 MW, 5500 MW and 8620 MW, respectively total produced energy in the end of study periods for each electricity growth scenarios are 32301 GWh, 39619 GWh and 54374 GWh. Nuclear power plant could be introduced in 2020 for scenario of 8% growth and 2017 for that of 10% growth. WASP is utilized for projecting electricity supply. Penulis : SC.S.Herdinie, Sudi Ariyanto, Edi Sartono, Suprapto, Nuryanti